Earned Value Management Jobs in California
1 - 15 of 78
Search Results - Earned Value Management Jobs in California
Lawrence Livermore National Laboratory-Livermore (CA)
We have an opening for a Project Controls Earned Value Management Lead who will have a strong......
clearancejobs.com -
BryceTech-El Segundo
environments.
Minimum Knowledge and Experience:
• Experience with and in-depth knowledge of the generation and analysis of Earned Value Management data.
Description of work:
1. Provide space acquisitions, engineering, operations, and technical advice...
resume-library.com -
Raytheon-Los Angeles
and coordinate the administrative and operational aspects of ongoing projects within program guidelines.
• Coordinate with program leadership, finance, and planning to execute Earned Value Management (EVM).
• Analyze data gathered and develop solutions...
PM2CM-Pomona
of projects. Our core expertise is in Project Controls which includes Scheduling, Cost Controls, Document Management and Controls, Budget tracking and monitoring, Estimating, Risk Analysis, Claims avoidance and Mitigation, Change Management and Earned Value...
resume-library.com -
Shimmick Construction Co.-Irvine
for subcontract and vendor quotes.Prepares subcontract bid analysis for scope, cost, and price.Understands Earned Value Management (EVMS) theory and application.
Qualifications
Minimum Requirements:Bachelor’s Degree in Engineering, Construction Management...
PM2CM-Monterey Park
for year basis.
Experience working through the entire project life cycle.
Knowledge of theories, principles and practices of cost/schedule management, earned value management, change management, forecasting, and risk assessment.
Preferred Qualifications...
resume-library.com -
Parker Aerospace-Irvine
May act as a Control Account Manager (CAM) for projects applying Earned Value Management (EVM).
Maintains and further develops professional and technical knowledge by attending educational workshops, reviewing technical publications...
mindmatch.ai -
Leidos-El Cajon
clearance.
Preferred Qualifications:
• A working knowledge and experience with space rated IR payloads
• Project Engineering experience/background or a desire to learn project
engineering
• Exposure or general knowledge of Earned Value Management
• MS...
6 similar jobs: La Jolla, Chula Vista, Cardiff By The Sea, Rancho Santa Fe, National City...
Raytheon-Goleta
RF Design, and in Digital Signal Processing
• Experience with Earned Value Management / Cost Account Management
• Experience with requirements tracking tools such as DOORS, DNG, or Cameo
• Active DoD Top Secret clearance with investigation within...
Leidos-National City (CA)
of Earned Value Management
• MS Project experience
Original Posting Date:
2024-08-14
While subject to change based on business needs, Leidos reasonably anticipates that this job requisition will remain open for at least 3 days with an anticipated...
6 similar jobs: San Diego, Rancho Santa Fe, La Jolla, Chula Vista, El Cajon...
Raytheon-Goleta
or Radar programs including prior leadership experience.
• Minimum of 8 years of system development for defense applications.
• Experience with Earned Value Management and Program Management
• Experience in the design, development, transitioning...
Leidos-San Diego
clearance.
Preferred Qualifications:
• A working knowledge and experience with space rated IR payloads
• Project Engineering experience/background or a desire to learn project
engineering
• Exposure or general knowledge of Earned Value Management
• MS...
Raytheon-Goleta
or Radar programs including prior leadership experience.
• Minimum of 8 years of system development for defense applications.
• Experience with Earned Value Management and Program Management
• Experience in the design, development, transitioning...
Raytheon-Goleta
to understand and analyze data related to semiconductor device performance.
• Experience with Design of Experiments (DoE) and Statistical Process Control (SPC).
• Understanding of Process Yields and Analysis.
• Earned Value Management Systems (EVMS) Experience...
Raytheon-Goleta
requirements for EW/Radar system test equipment and Special Test Equipment
• Experience with Earned Value Management / Cost Account Management
• Experience with requirements tracking tools such as DOORS
• Active DoD Top Secret clearance with investigation...
123456
Companies now hiring in California:
Earned Value Management jobs in California – Similar offers:
Earned Value Management jobs – More cities:
Broaden your job search:
Don’t miss out on new job openings!
Create a job alert for: Earned Value Management, California
It's free, and you can cancel email updates at any time
123456